Skip to main content

Kinergy and Matrix Concepts sign term sheet for on-site power plants

Matrix Concepts will provide development sites, while Kinergy will assess the proposed plants and oversee engineering, construction and long-term maintenance.

By Maya Santos

Industrial power generation equipment beside factory buildings
Photo: New Straits Times

Kinergy Advancement Bhd and Matrix Concepts Holdings Bhd have signed an exclusive term sheet for captive power facilities serving Matrix Concepts’ large property developments. The scope includes engineering and procurement, construction, commissioning, operations and maintenance.

As landowner, Matrix Concepts will supply the identified sites. Kinergy will lead the engineering and construction activities and maintain the proposed facilities over the long term. It will also evaluate each project’s commercial and technical requirements, including electricity demand, generating capacity, plant dimensions and project structure.

Datuk Lai Keng Onn, Kinergy’s executive deputy chairman and group managing director, said on-site generation could give landowners greater assurance over power supply while allowing capacity planning to reflect development needs. He said producing electricity nearer its users could lessen exposure to constraints and disruptions affecting grid supply.

The proposed facilities are intended to help prepare industrial sites for electricity-intensive users, including data centres, semiconductor producers, advanced manufacturers and other operations with substantial power requirements.

Keep reading: Business & Companies

All Business & Companies stories

Latest in Finance

All latest